variant stuff

Home Forums Spreadsheet Owners Only variant stuff

Tagged: 

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #514

    hey Pup, when setting up/ updating our variant data base. how many days back do you use. i am using

    1000 days. i don’t know if i made that choice or if it was the default. that seems like a long time back

    when talking time. some tracks i don’t have that much data but some i do. by my guesstimation the sheet

    is going back 90 days+-. Pupspeed 45-50 days. would using one of those date ranges better? as long as you

    are catching the races used today is there any need to go way back or does the way back set the ground work

    for today. thanks 401K9

    win

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.